Well I had 5 days off to get a bunch done on the frame. Well that didn't happen. What I did get done was the rear crossmember tacked in place and after 3 days of trying to get the engine and the firewall to get along. I had to gut the xmember to get it to work with the 32 frame and 39 tranny. So Now I will have to make a new upper and lower plate to tie them together. I also had to chop the tranny mount up, removing about 1.5" to get it lower in the crossmember.
Here are a couple of cell phone pics.